| Pub. No. |
|
Title |
Authors |
|
|
FHWA-ICT-08-015
|
ICT-R27-29
|
Proceedings of the Particulate Matter Hot Spot Analysis Peer Exchange Meeting
|
Jie Lin, Wenjing Pu, Walt Zyznieuski
|
Apr-08
|
|
FHWA-ICT-08-014
|
R27-2
|
Nighttime Construction: Evaluation of Lighting Glare for Highway Construction in Illinois
|
Khaled El-Rayes, Liang Y. Liu, Mostafa Elseifi, Feniosky Pena-Mora, Marwa Hassan, Frank Boukamp, Ibrahim Odeh
|
Jan-08
|
|
FHWA-ICT-07-008
|
ICT R-39
|
DYNAMIC MODULUS PERFORMANCE OF IDOT MIXTURES
|
S.H. Carpenter
|
Dec-2007
|
|
FHWA-ICT-07-013
|
ICT-R23
|
Evaluation of Risk in End-Result Specifications for Asphalt Pavement Construction
|
William Buttlar and Anshu Manik
|
Dec-07
|
|
FHWA-ICT-07-010
|
R27-8
|
Evaluation of Hot-Mix Asphalt Sampling Techniques
|
Mostafa Elseifi
|
Aug-07
|
|
FHWA-ICT-07-011
|
R27-13
|
Phase III:CRS Prediction Model Development
|
Laura Heckel, Yanfeng Ouyang
|
Aug-07
|
|
FHWA-ICT-07-012
|
R27-13
|
UPDATE OF CONDITION RATING SURVEY (CRS) CALCULATION/PREDICTION MODELS: FINAL REPORT
|
Laura Heckel, Yanfeng Ouyang
|
Aug-07
|
|
FHWA-ICT-07-006
|
ICT/IHR R39
|
HMA Dynamic Modulus: Temperature Relations
|
Gabriel Garcia, Marshall R. Thompson
|
Jun-07
|
|
FHWA-ICT-07-009
|
ICT-R27-13
|
Phase 2. CRS Calculation Model
|
Laura B. Heckel, Yanfeng Ouyang
|
Jun-07
|
|
FHWA-ICT-07-001
|
ICT-R27-11
|
Reclaimed Asphalt Pavement- A Literature Review
|
Imad L. Al-Qadi, Mostafa Elseifi, Samuel H. Carpenter
|
Mar-2007
|
|
FHWA-ICT-07-003
|
ICT-R27-14
|
CVISN - CVIEW/SAFER DATABASE
MAPPING PROJECT
|
Pete Nelson, John Hayward, John Dillenberg
|
March 2007
|
|
FHWA-ICT-07-005
|
IHR-R39
|
HMA Dynamic Modulus Predictive Models: A Review
|
Gabriel Garcia, Marshall R. Thompson
|
Jan-07
|
|
FHWA-ICT-07-002
|
ICT-R27
|
Proceedings of the Mobile Source Air Toxics Peer Exchange Meeting
|
Jie Lin, Wenjing Pu, Walt Zyznieuski
|
December 2006
|
|
TES-141
|
IHR-R32
|
ACCELERATED PAVEMENT TESTING OF EXTENDED LIFE CONTINUOUSLY REINFORCED CONCRETE PAVEMENT SECTIONS
|
Erwin Kohler, Jeffery Roesler
|
Dec-06
|
|
FHWA-ICT-07-007
|
ICT-R39
|
FATIGUE PERFORMANCE OF IDOT MIXTURES
|
S.H. Carpenter
|
Jul-2006
|
|
FHWA-ICT-07-004
|
ICT/IHR-R36
|
ASSESSMENT OF THE SEISMIC
VULNERABILITY OF WALL PIER SUPPORTED
HIGHWAY BRIDGES ON PRIORITY EMERGENCY
ROUTES IN SOUTHERN ILLINOIS
|
John Bignell, James LaFave, Neil Hawkins
|
April 2006
|
|
TES-142
|
--
|
High Tension Cable Median Barrier: A Scanning Tour Report
|
Juan C. Medina, Rahim F. Benekohal
|
Jan-06
|
|
TES-140
|
--
|
Effect of High and Low Temperatures on UPS Systems for Intersection Traffic Signals
|
M. Chitturi, R. Benekohal
|
Sep-05
|
|
TES-139
|
--
|
Evaluation of Three Recent Models of UPS for Intersection Traffic Signals with LED
|
M. Chitturi, R. Benekohal
|
Jul-05
|
|
TES-136
|
--
|
GIS-based Intersection Inventory System (GIS-IIS):Integrating GIS, Traffic Signal Data and Intersection Images
|
Dazhi Sun, Rahim F. Benekohal, Montty Girianna
|
Feb-05
|
|
TES-137
|
--
|
INVESTIGATION OF AGGREGATE SHAPE EFFECTS ON HOT MIX PERFORMANCE USING AN IMAGE ANALYSIS APPROACH
|
Erol Tutumluer, Tongyan Pan, Samuel H. Carpenter
|
Feb-05
|
|
TES-135
|
IHR-R25
|
Performance Evaluation of Longitudinal Pipe Underdrains
|
J. Stein, B. Dempsey
|
Nov-04
|
|
TES-134
|
--
|
Findings of the Focus Group Meetings for the Pilot Study of Advisory On-Board Vehicle Warning Systems at Railroad Grade Crossings
|
R. Benekohal
|
Jun-04
|
|
TES-130
|
--
|
Analyses of Drivers' Opinions about Railroad Grade Crossings Traffic Control Devices and Safety: Background Survey
|
R. Benekohal, M. Aycin
|
Mar-04
|
|
TES-131
|
--
|
Analyses of the Driver's Responses (In Survey Number 2) to the In-Vehicle Receiver (IVR) After Experiencing One Mode of Operation
|
R. Benekohal, C. Rawls
|
Mar-04
|
|
TES-132
|
--
|
Analyses of Drivers’ Responses to In-Vehicle Receiver (IVR) after Experiencing Two Modes of Operation
|
Rahim F. Benekohal, Carmen G. Rawls
|
Mar-04
|
|
TES-133
|
--
|
Analyses of Drivers' Responses in Final Surveys to the In-Vehicle Receiver (IVR)
|
R. Benekohal, C. Rawls
|
Mar-04
|
|
TES-121
|
--
|
A Comparison Between the Turn On and Turn Off Characteristics of Incandescent and LED Traffic Signal Modules
|
Rahim F. Benekohal, Montty Girianna, Madhav V. Chitturi
|
Dec-03
|
|
TES-127
|
--
|
Evaluation of UPS for Intersection Traffic Signals with LED's: Findings for Myers PB-1250PC UPS
|
M. Chitturi, R. Benekohal
|
Dec-03
|
|
TES-128
|
--
|
Evaluation of UPS for Intersection Traffic Signals with LED's: Findings for Alpha Novus 1000 UPS
|
M. Chitturi, R. Benekohal
|
Dec-03
|
|
TES-129
|
--
|
Evaluation of UPS for Intersection Traffic Signals with LED's: Findings for TechPower M1000 UPS
|
M. Chitturi, R. Benkohal
|
Dec-03
|
|
TES-125
|
IHR-R24
|
GIS-ILLINET Version 2.0 Pavement Management & Information System User's Guide
|
G. Bham, N. Gharaibeh, M. Darter
|
Jun-03
|
|
TES-126
|
--
|
High Performance Concrete for Transportation Structures
|
D. Lange
|
Jun-03
|
|
TES-124
|
--
|
Structural Condition and Service Load Performance of Deteriortated Pretensioned Deck Beam Bridges
|
N. Hawkins
|
May-03
|
|
TES-119
|
IHR-R32
|
Construction of Extended Life Continuously Reinforced Concrete Pavements at ATREL
|
Erwin Kohler, Genevieve Long, Jeff Roesler
|
Dec-02
|
|
TES-120
|
--
|
Driver's Evaluation of Performance of LED Traffic Signal Modules
|
R. Benekohal, M. Chitturi
|
Dec-02
|
|
TES-122
|
--
|
Longevity of Highway Pavements in Illinois- 2000 Update
|
N. Gharaibeh, M. Darter
|
Dec-02
|
|
TES-116
|
--
|
Intelligent Transportation System (ITS) Activities and Needs in IDOT District Offices
|
Jeremy R. Chapman, Rahim F. Benekohal
|
May-02
|
|
TES-117
|
--
|
Performance Evaluation of the Pilot Study of Advisory On-board Vehicle Warning Systems at Railroad Grade Crossing
|
Murat F. Aycin, Rahim F. Benekohal
|
May-02
|
|
TES-118
|
--
|
Test to Failure of a 54 Ft. Deteriorated Pretensioned Precast Concrete Deck Beam
|
Neil M. Hawkins, Juan B. Fuentes
|
May-02
|
|
TES-115
|
--
|
Light Emiting Diode (LED) Traffic Signal and Uninterruptible Power Supply (UPS) Usage: A Nationwide Survey
|
J. Chapman, R.F. Benkohal
|
Dec-01
|
|
TES-113
|
--
|
Comparison of Delays from HCM, Synchro, PASSER II, PASSER IV, and CORSIM for an Urban Arterial
|
Rahim F. Benekohal, Yoassry M. Elzohairy, Joshua E. Saak
|
Aug-01
|
|
TES-112
|
IHR-R24
|
Development of a Bridge Smoothness Specification for Illinois DOT
|
Dulce Rufino, Kenyatta BaRaKa, Michael I. Darter
|
May-01
|
|
TES-110
|
IHR-R22
|
Effects of Short Term Oven Aging on Volumetrics and Selection of N-Design
|
Bradley J. McMullen, William R. Vavrik, Samuel H. Carpenter
|
Oct-00
|
|
TES-111
|
--
|
Video Image Analysis of Aggregates
|
Erol Tutumluer, Chetana Rao, Joseph A. Stefanski
|
Jul-00
|
|
TES-109
|
IHR-R22
|
Effect of Flat and Elongated Coarse Aggregate on Characteristics of Gyratory Compacted Samples
|
William R. Vavrik, Randy J. Fries, Samuel H. Carpenter, Brian D. Aho
|
Mar-00
|
|
TES-103
|
IHR-028
|
Drivers Assessment of High Speed AVI/WIM System at a Weigh Station in Illinois
|
Rahim F. Benekohal, Courtney M. Tirums, Stanley L. Wang, Earl R. Forrler
|
Jan-00
|
|
TES-099
|
IHR-540
|
Work Zones and Their Impact on User Costs
|
Ghulam H. Bham, James E. Hicks
|
Mar-99
|
|
TES-100
|
IHR-540
|
Evaluation and Improvement of the CRS Prediction Models
|
Nasir G. Gharaibeh, Michael I. Darter, Laura B. Heckel
|
Mar-99
|
|
TES-101
|
IHR-540
|
Field Performance of Continuously Reinforced Concrete Pavement in Illinois
|
Nasir G. Gharaibeh, Michael I. Darter, Laura B. Heckel
|
Mar-99
|
|
TES-102
|
IHR-540
|
Interstate 80 Pavement Rehabilitation Corridor Study
|
Cynthia J. Wilson, Michael I. Darter
|
Mar-99
|
|
TES-097
|
IHR-535
|
Mechanistic-Empirical Evaluation of the Mn/Road Mainline Flexible Pavement Sections
|
C. Alvarez, M.R. Thompson
|
Jun-98
|
|
TES-098
|
IHR-535
|
Fatigue of Concrete Beams and Slabs
|
J.R.Roesler, E.J.Barenberg
|
Jun-98
|